Serving 38 States · Licensed & Insured

Lines So Precise,
Refs Stop Arguing.

Regulation-spec court markings for gymnasiums, tennis courts, tracks, and turf fields. We measure twice, paint once — and back every line with a written repaint guarantee.

What type of facility needs new lines?

Straight lines or we repaint free.
Professional court line painting on maple hardwood gymnasium floor with fresh white boundary lines
NCAA Certified
Regulation-spec markings
48-Hr Dry
Guaranteed
4,200+Courts Painted
18 yrsIn Business
0Guarantee Claims Unpaid
38States Served
⚑ Our Guarantee

Regulation-spec or we remeasure and repaint — zero cost.

Every marking we lay follows the exact specifications of the governing body for your sport — NBA, NCAA, NFHS, USTA, FIVB, USA Pickleball. We bring the rulebook to every job. If a referee disputes a line, we come back. No invoice.

Our crew verified a three-point arc on a Division II gymnasium floor in Columbus, OH — NCAA spec is 22 feet 1¾ inches from basket center. Our measurement: 22'1¾" at every point around the arc. Tape doesn't lie.

±¼ inch
Our line tolerance — every job
Close-up of tape measure against freshly painted three-point arc on maple hardwood basketball court floor
±¼ inch
Our line tolerance — every job
⚑ Our Guarantee

Dry and playable in 48 hours or we cover your facility rental.

We use fast-cure, low-VOC athletic floor paint rated for heavy play within 24–48 hours. We schedule our work around your calendar — not the other way around. If curing runs over our guarantee window, your rental cost is on us.

A parks department in suburban Denver needed three outdoor basketball courts repainted before Saturday morning league play. We finished Thursday at 6 PM. Courts were dry and playable by Friday noon — 18 hours ahead of our guarantee.

48 hrs
Maximum cure time — guaranteed
Outdoor basketball court with freshly painted white boundary lines and three-point arc drying overnight under court lights
48 hrs
Maximum cure time — guaranteed
⚑ Sport Markings We Deliver

Every Line, Every Sport.
One Crew. One Guarantee.

From the three-point arc on maple hardwood to the kitchen line on a fresh pickleball court — we paint them all to regulation spec.

🏀

Basketball

NBA / NCAA / HS regulation

94×50 ft full court or 84×50 ft HS — three-point arc, free-throw circle, restricted area, lane lines, midcourt.

🎾

Tennis

USTA certified layout

Singles & doubles sidelines, service boxes, net center mark — all to 1/4-inch tolerance.

🏐

Volleyball

FIVB / NCAA

Attack lines, center line, 10-foot service zones, antenna marks.

🏸

Badminton

BWF standard

Singles/doubles court lines, service courts, back boundary lines.

🥒

Pickleball

USA Pickleball

20×44 ft court, non-volley zone (kitchen), centerline, baseline — the fastest-growing sport we serve.

🏃

Running Track

NFHS / IAAF

Lane markings, stagger lines, exchange zones, steeplechase water jump, sector lines.

Soccer / Football

FIFA / NFHS

Penalty areas, center circle, corner arcs, hash marks, end zones, yard lines.

🎯

Multi-Sport Overlay

Custom color coding

Stack basketball, volleyball, pickleball, and badminton on one floor using distinct colors — no confusion, maximum usage.

Surfaces We Work On

Maple HardwoodConcreteAsphaltSynthetic TurfNatural GrassRubber TrackSport Court Tiles
Common Questions

Questions We Hear
Before Every Job.

Athletic directors and facility managers ask us the same things. Here are honest answers.

📞

Prefer to talk through it?

Schedule a 15-minute call with a crew coordinator. No obligation — just a straight conversation about your facility.

(800) 555-1234 →
We work to a 1/4-inch tolerance on all regulation markings. Our crew uses laser-guided layout equipment and measures every key point before paint touches the surface. NCAA three-point arc? 22 feet 1'¾" from basket center — we verify it twice.
Simple: we come back and repaint it at zero cost. No negotiation, no billing dispute. That's the Stripe guarantee — straight lines or we repaint free. We've honored this on fewer than 0.4% of jobs in 18 years.
Indoor maple hardwood: typically 24–36 hours for full cure. Outdoor concrete/asphalt: 12–24 hours. We guarantee dry and playable within 48 hours of completion — if we miss that window, we cover your facility rental cost for the delay period.
Yes — multi-sport overlays are one of our most requested services. We use color-coded lines (e.g., yellow for basketball, white for volleyball, blue for pickleball) so each sport's markings are immediately readable. We'll provide a color layout plan before any paint hits the floor.
Absolutely. Team logos, tournament graphics, sponsor marks, school seals — we paint them all using vinyl stencils or freehand airbrush for complex artwork. Broadcast-ready midcourt logos are a specialty.
Maple hardwood gymnasium floors, concrete, asphalt, rubber running tracks, synthetic turf, natural grass, and Sport Court modular tiles. If it's a regulation playing surface, we've painted it.
⚑ 5-Minute Assessment

Know Your Scope Before
You Pick Up the Phone.

Answer 5 quick questions about your facility. We'll generate a custom scope summary — facility type, sport markings, estimated timeline, and ballpark cost range — before we ever talk.

1
Facility
2
Sq Ft
3
Condition
4
Sports
5
Timeline
Call (800) 555-1234

No account. No credit card. Just your custom scope in 5 minutes.